Saturday, November 08, 2008

Progress


Next, insulation gets packed in between the rafters. This up-to-date stuff should not only keep us a bit warmer (and maybe cut our fuel bills a bit) but isn't a fire risk either. The previous insulation was shredded newpapers, laid over the electrical wiring, some of which was in very poor condition - a huge hazard.

















Then the flooring can be added, in nothing more glamorous than 18mm ply, and the verticals added to tie-the roof in and provide the basis for walls.

No comments: